The first trolleys for the Russian HSR were made in the Urals
In the Sverdlovsk Region, the Ural Locomotives plant has produced the first set of trolleys for a train that will run along the first Moscow–St. Petersburg high-speed railway. The gearboxes for trolleys have been successfully tested.
Advanced robotic welding systems are used for the production of trolley frames. This guarantees the highest quality of the welds. Fatigue and resource tests were carried out by the All-Russian Scientific Research and Engineering Institute of Rolling Stock in Kolomna. They confirmed the strength and reliability of the structure.
16 trolleys will be used for each eight-car train. Four wagons will be equipped with motorized trolleys and four with non—motorized ones. Special attention was paid to the development of a unique traction gearbox for a motor truck. It was created at the Sverdlovsk plant. The gearbox has passed tests, including for extreme temperature conditions, it has been tested in sprinkler and dust chambers, as well as on a stand that simulates train movement at a speed of 400 km/h.
Later, specialists will roll the trolleys under the carriages of the first train No. 001, which will be sent for testing next year, writes <url> news agency.
In early November, it was reported that the Ural Locomotives plant in the Sverdlovsk Region had completed welding of all 16 wagons of the first two high-speed trains. The head fairing and the automatic coupling device are installed. All 16 wagons of the first two trains have already been welded and painted, and electrical equipment and pantographs are being assembled and installed.
Переведено сервисом «Яндекс Переводчик»