Sobyanin announced the construction of the left tunnel between the stations "ZIL" and "Island of Dreams"
- Новости
- Local news
- Sobyanin announced the construction of the left tunnel between the stations "ZIL" and "Island of Dreams"
On the Biryulevskaya metro line, the construction of the left tunnel has been completed in the section between the ZIL and Island of Dreams stations. This was announced by the mayor of the capital, Sergei Sobyanin, in his channel in the Maks messenger.
The metrotunnel is laid under the backwater of the Novelty, the surface part of the Zamoskvoretskaya metro line, as well as under Likhachev and Andropov Avenues. The maximum laying depth reaches 29 m.
The construction of the tunnel in accordance with the plan required increased attention to the accuracy of the work. At the very beginning of the route, the Elena tunneling complex overcame the section under the reverse dead ends of the ZIL station of the Troitskaya Line. At the same time, the distance from the shield to the structures of the operating station was less than a meter. To ensure safety and prevent possible damage, the builders have reduced the speed of the complex. In addition, specialists strictly controlled the amount of extracted soil and monitored the condition of structures around the clock, identifying possible deformations.
Currently, work is underway on laying the right tunnel in the section between the ZIL and Island of Dreams stations. The tunneling is carried out by the Victoria tunneling complex. In parallel, the Olga shield is constructing the left tunnel from the Klenovy Boulevard station in the direction of Kuryanovo, and the Esmina complex is involved in the construction of a connecting branch that will connect the Biryulevskaya and Zamoskvoretskaya metro lines.
The new Biryulevskaya line will start from the ZIL station and provide transport links to the Biryulyovo Vostochnoye and Biryulyovo Zapadnoye districts. According to forecasts, by 2030, more than 260 thousand people will live in these areas. The new line will reduce the travel time to the center of Moscow for local residents by 1.5 times.
The project is planned to be completed in two stages in 2028-2029. The Biryulevskaya line will become the seventh new branch of the Moscow metro, built since 2011. Only modern trains of domestic production will be used to operate on the line.
Переведено сервисом «Яндекс Переводчик»