Welding of the cars of the first two Russian super trains was completed in the Urals
- Новости
- Local news
- Welding of the cars of the first two Russian super trains was completed in the Urals
Welding of all 16 wagons of the first two high-speed trains has been completed at the Ural Locomotives plant in the Sverdlovsk Region. This was announced by Governor Denis Pasler on Tuesday, November 3.
"The head fairing and the automatic coupling device are installed. All 16 wagons of the first two trains have already been welded and painted, and electrical equipment and pantographs are being assembled and installed," the head of the region said.
The machine builders have also completed the manufacture of the first batch of the main elements of the electric train chassis. Motor and non-motor trolleys are already undergoing preliminary tests before being rolled under the wagons.
It is expected that the first super train will go on trials in 2027, according to the news agency " <url>". By the end of 2026, a production complex with an area of 67 thousand square meters will be built for the serial production of high-speed trains in the future. The traction equipment testing center, which will become part of it, is already ready and in operation.
In mid-summer, it was reported that Russian Railways had fitted the head and nose fairings for the country's first high-speed train. The head fairing is responsible for the tightness of the driver's cabin, and the nose module is designed to protect the coupling device from snow, ice, dust and dirt.
Переведено сервисом «Яндекс Переводчик»