The tunnel between the Biryulevskaya and Zamoskvoretskaya metro lines has begun in Moscow.
- Новости
- In Focus
- The tunnel between the Biryulevskaya and Zamoskvoretskaya metro lines has begun in Moscow.
The construction of a connecting line between the Biryulevskaya and Zamoskvoretskaya metro lines has begun, Moscow Mayor Sergei Sobyanin said in the Maks messenger.
The Esmina shield will run about 565 m from the mounting chamber at the Zamoskvoretsky radius towards the ZIL station of the Biryulevskaya line. The work will be carried out in the Danilovsky district, in the floodplain of the Moskva River. The maximum depth of the foundation will be 23.8 m.
According to Sobyanin, the specialists will work in difficult hydrogeological conditions: in bulk soils, water-saturated sands and hard clays.
"The shield's path is blocked by dense urban development and an extensive network of underground utilities. During the entire excavation, specialists will monitor the condition of buildings and engineering networks in the area of its influence," the mayor said.
At the same time, the construction of stations of the first section of the Biryulevskaya line is underway, which will connect the BCL, MCC, Troitskaya and Zamoskvoretskaya branches. The work is scheduled to be completed in 2028. Sobyanin said that the metro will become more accessible to almost 300,000 residents of three districts of the city.
Переведено сервисом «Яндекс Переводчик»