A new bicycle-pedestrian bridge on Tatyshev in Krasnoyarsk will be built for 1.11 billion rubles.
- Новости
- Local news
- A new bicycle-pedestrian bridge on Tatyshev in Krasnoyarsk will be built for 1.11 billion rubles.
A contractor has been identified in Krasnoyarsk to build a new pedestrian bicycle bridge to Tatyshev Island. This is reported by the city administration.
The contract for the work worth 1.11 billion rubles was awarded to Geostroy LLC from Sochi. The contractor will have to dismantle the existing dilapidated bridge and erect a new structure with a system of cables and architectural pylons.
"This is one of the landmark projects of the 400th anniversary of Krasnoyarsk. The facility will connect our island with the bank of the Yenisei River in the Zelenaya Roscha microdistrict, and form a new multi—kilometer route for hiking and cycling in the city," said Mayor Sergey Vereshchagin.
According to the KrasnoyarskMedia news agency, the length of the crossing will be 279 m, together with the approaches — 633 m. Pedestrian paths and a two-way bike path will be built on both sides of the building. The structure itself will be decorated with a backlight.
The work will take place in several stages. The construction is scheduled to be completed in December 2027.
Переведено сервисом «Яндекс Переводчик»