Batteries were turned on in almost 900 residential buildings in Kurgan
Heating was supplied to 851 residential buildings in Kurgan in three days. Heating networks will be filled for another three days: after switching on the batteries, management organizations need to set up indoor systems.
The heating has been switched on since September 28. Already on September 30, thermal power engineers filled the networks at several hundred addresses in different districts of the regional capital. These are, in particular, Zaozerny, Cheremukhovo, Poplars and the village of Uval.
As explained in the press service of the Kurgan generating company, it is technically impossible to connect the entire city at the same time. Batteries are filled with chemically prepared water gradually to prevent a sharp increase in its volume in the system.
If the house has already appeared on the heating schedule, but the batteries remain cold, residents are asked to wait 1-3 days. During this time, the Management company must carry out the necessary work inside the house, writes the news agency " <url>".
Earlier, Izvestia wrote that Internet scammers began using various schemes to deceive Russians before the start of the heating season. This topic is extremely convenient for attackers, as it affects almost all residents of apartment buildings.
Переведено сервисом «Яндекс Переводчик»