Sobyanin announced Moscow's readiness for the heating season
Moscow is ready for the heating season, the mayor of the capital, Sergei Sobyanin, said in the "Maks" messenger. The city services carried out preventive inspections, repairs of engineering systems and equipment.
The head of the capital said that from May to August, specialists prepared about 74 thousand buildings for the season. Indoor central heating systems have been updated in more than 820 houses. Hydraulic tests were carried out on 19.5 thousand km of heating networks.
"The existing capacities allow stable and uninterrupted supply of energy resources to consumers, promising urban programs and infrastructure projects," Sobyanin stressed.
The mayor also spoke about the preparation of public utilities for work in winter. Emergency teams have been formed in the city, which are equipped with specialized equipment and equipment. 54 stationary snow disposal sites have also been prepared in Moscow.
In 2025, the head of the capital announced the start of the heating season in Moscow on September 24. It took several days to turn on the heating at all facilities.
Earlier, Sobyanin spoke about the work of Moscow utilities in the capitals of the Lugansk and Donetsk People's Republics. In particular, specialists are involved in the preparation of apartment buildings and social facilities in Lugansk and Donetsk for the autumn-winter period. They carry out flushing and hydraulic tests of heating systems, repair identified damage and inspect boiler rooms.
Переведено сервисом «Яндекс Переводчик»