Sobyanin spoke about the work of Moscow utilities in the DPR and LPR
In 2026, with the participation of Moscow utilities, over 130 km of water, heat, electricity and sanitation networks were repaired and restored in the capitals of the Luhansk and Donetsk People's Republics. This was announced by the mayor of the Russian capital, Sergei Sobyanin, speaking about the role of the capital's utilities in restoring the engineering networks of Moscow's twin cities of Donetsk and Lugansk.
"As in previous years, the work is comprehensive and covers all major life support systems," Sobyanin wrote on his channel in Maks. In particular, he pointed out, the equipment at the water intake sites in Donetsk has been updated. "A separate area of work is the repair of boilers, replacement of pumping and heat exchange equipment, filters and tanks in boiler rooms," the mayor added.
In turn, a new sewage treatment plant for biological wastewater is being built in Lugansk. The water supply station will also be upgraded in the city this year and the sewage pumping station will be reconstructed.
Moscow utilities are also involved in the preparation of apartment buildings and social facilities in the twin cities for the autumn-winter period. They carry out flushing and hydraulic tests of heating systems, repair identified damage and inspect boiler rooms.
Sobyanin recalled that Moscow emergency crews have been on constant duty in Lugansk and Donetsk since August 2022. To carry out work of any profile, the teams are equipped with the necessary tools and equipment, the mayor added.
Переведено сервисом «Яндекс Переводчик»