Skip to main content
Advertisement
Live broadcast

The preparation of heating systems for the autumn-winter period has been completed in Moscow

0
Озвучить текст
Select important
On
Off

Specialists from the municipal management complex have completed hydraulic tests of heating systems in preparation for Moscow's autumn-winter period. This was announced on Wednesday, August 26, by the Deputy Mayor of the capital for Housing and Communal Services and landscaping, Peter Biryukov.

According to him, 9.2 thousand km of main and 10.2 thousand km of distribution networks have been prepared for uninterrupted operation, which provide heat to more than 74 thousand buildings, including over 34 thousand residential buildings. All planned activities have been completed, and hot water supply at city facilities has been restored.

Biryukov noted that hydraulic tests make it possible to detect potentially unreliable areas in advance and repair them before the start of the heating season. This year, the work was divided into 600 ten-day stages, Moscow 24 clarifies. MOEK specialists increased the pressure in the pipelines above the operating level, simulating loads during the winter cold. During the testing period, hot water was turned off in the houses.

In addition, in the summer, specialists shifted part of the pipelines, carried out preventive and major repairs of heating stations and central heating points, as well as serviced and repaired indoor heating and hot water supply systems. 360.ru .

Prior to that, on August 21, it was reported that more than 70% of apartment buildings in the Moscow region had already been prepared for the upcoming winter. This is 37 thousand objects.

Переведено сервисом «Яндекс Переводчик»

Live broadcast