Skip to main content
Advertisement
Live broadcast

The draft layout of the Novorizhskaya transport hub has been approved

0
Photo: RIA Novosti/Maxim Blinov
Озвучить текст
Select important
On
Off

The Moscow authorities have approved the draft layout of the Novorizhskaya transport hub. It will include the Rublyovo-Arkhangelskaya metro line station under construction, ground transport stops and intercept parking lots, the mayor of the capital, Sergei Sobyanin, said in his channel in Maks.

Modern residential complexes, a kindergarten and office buildings will also be built in the area, Sobyanin wrote. The total non-residential land area of the building will be more than 190 thousand square meters. m. According to forecasts, more than 20 thousand people will use the transport hub daily.

The Mayor of Moscow noted that as part of the project, a street and road network will be built for convenient access. In particular, the transport interchange at the intersection of Novorizhskoye and Ilyinsky highways will be reconstructed. There will be directional overpasses-exits, high-speed transfer lanes and side passages, the head of the capital explained. The surrounding area will be landscaped.

"As a result, the city will have a new quarter for 3.4 thousand people, as well as 2 thousand jobs," Sobyanin stressed.

Earlier, the draft layout of the transport hub in the Biryulyovo Vostochnoye area was approved. It will include the Lebedyanskaya metro station of the Biryulevskaya line under construction, as well as ground transportation stops. In addition, it is planned to place an intercept parking and a multifunctional public and shopping complex on the territory.

Переведено сервисом «Яндекс Переводчик»

Live broadcast